Single Point Connection – Specifications

Part Numbers Example Single Point Connection Specifications

Factory Pre-wire Service includes installation and wiring of the motor, motor sheave, pump, float, control box and the pump junction box.  The control box for the SPC is ready for the 120V pump supply wire and the motor voltage supply.  For the SPCR the control box is wired for only 240V motor AND pump.

Order process will be to order the Cooler, Motor, Motor Sheave, 115V Pump, Float and the SPC model accessory.

[table id=30 /]